A QUOTATION FOR LEASING WORKSHOPS IN CHAU DUC INDUSTRIAL PARK
LOCATION |
Chau Duc Urban I.P & Golf Course, Hoi Bai - Châu Pha - Da Bac road, Suoi Nghe commune, Chau Duc district, Ba Ria – Vung Tau province.
|
INVESTOR |
SONADEZI AN BINH JOINT STOCK COMPANY
Add : 113-116, lot C2, 9th street, An Binh residential area, An Binh ward, Bien Hoa city, Dong Nai province
Tel : 84-251- 3836106
Fax : 84-251-3836292
E-mail : sza@sonadezianbinh.com.vn
Website: www.sonadezianbinh.com.vn
|
WORKSHOP AREA |
Area of workshop for lease: D13 Road, Chau Duc Urban I.P & Golf Course, Chau Duc district, Ba Ria – Vung Tau province.
- Total of land: (W.S1: 5.050m); (W.S2: 5.100); (W.S3: 5.050m)
- Area of workshop 1: 36m x 68m = 2.448 m2
- Area of workshop 2: 36m x 68m = 2.448 m2
- Area of workshop 3: 36m x 68m = 2.448 m2
** Note: Workshop area includes: production area, office, infrastructure (parking lot, guardhouse, green area, internal road, …)
|
RENTAL FEE AND PAYMENT METHOD |
1. Rental fee:
a. Workshop rental fee: USD 3.5/m2/month (not inclusive of VAT; for production and office area only) and increase 15% after every five years.
b. Management fee: Customers pay the fee directly to the I.P investor.
c. Waste water treatment fee: Customers pay the fee directly to the I.P investor.
2. Payment method: pay monthly.
• Deposit: 6 months of rental fee.
• Minimum leasing period: 5 years.
|
ELECTRICITY
SYSTEM
|
Electric system, telephony which are satisfied the customers, have been completed |
WATER SUPPLY |
Capacity: 75.000 m3/day (stage 1) and maximum capacity of 150.000 m3/day (stage 2)
|
WASTE WATER TREATMENT |
Three wastewater treatment plants which are being built with total of capacity of 45.000 m3/day. currently operating 500m3/ day
|
TRANSPORTATION |
- 6 km to National Road No. 56
- 13 km to National Road No. 51 (by Hoi Bai – Da Bac)
- 44 km to Vung Tau City
- 16 km to Thi Vai Port
- 19 km to Cai Mep Port
21 km to Go Dau Port
|
TELECOMMUNICATION |
Power system, Telecommunication is completed.
|
ENCOURAGE INDUSTRIES |
* High-tech and clear industrial parks in the North:
- Assembly of electronic components, computers and semiconductors;
- cable and telecommunications materials;
- Pharmaceuticals product, medical equipment;
- Assembly of automobiles, motorcycles, bicycles;
- Exact mechanics;
- Household electrical appliances,
- Manufacturing and processing of gold, silver, precious stones, diamonds and precious metals.
Multi-branch industrial park located in the South:
- Mechanical processing, steel structure;
- Processing agricultural products, agricultural pharmaceutical products;
- Production of building materials;
- Processing of garment: High fashion clothing, leather shoes, weaving;
- Production of plastic products;
- Wood processing and high-grade furniture;
- Petrochemical products, all kinds of chemicals.
In order to ensure the environment, the industrial park does not receive and restrict investment in branches: paper pulp production, plating technology, seafood processing, rubber latex processing, waste materials, steel processing ...
|
SUPPORTING SERVICES |
Land leasing price incentives, flexible management fees, actively support for issuing of Investment Certificate, Business registration Certificate, Building permit, and other related procedures in the locality. |
For any further information, please contact us at:
BUSINESS DEPARTMENT
113-116, lot C2, street 9, An Binh residential area, An Binh ward, Bien Hoa city, Dong Nai province.
Hotline: +84 909 300 319 (Ms. Lan) Tel.: +84 251 3836 106
Email: nnd.lan@sonadezianbinh.com.vn
|
Download here
The plant investment in Suoi Tre Industrial Zone
|