Introduction of concrete blending station’s capacity
I. The overview of introduction:
Sonadezi concrete enterprise was established with a 60 m3/ hour fresh concrete blending station at Long Thanh industrial zone from March, 2004, the concrete output and consuming is growing day by day.
- Year 2004 : 14.213,1 m3
- Year 2005 : 29.222,0 m3
- Year 2006 : 42.958,4 m3
![](/vnt_upload/File/Image/XN Be tong/xnbt.jpg)
The overview of concrete blending station with 60 m3/h capacity at Long Thanh industrial zone
To April, 2007, because of the needs of opening the consuming market and manufacturing scale, concrete enterprise continues to establish another one with a 90 m3/hour fresh concrete blending station at Bien Hoa industrial zone 1 and operated on November, 2007.
- Year 2007 : 64.411 m3
- April, 2008 : 20.401 m3
![](/vnt_upload/File/Image/XN Be tong/xnbt_1.jpg)
The concrete blending station at Bien Hoa IZ
II. Introduction of capacity
1. Machinery and equipment
Concrete blending station at Long Thanh industrial zone
![](/vnt_upload/File/Image/XN Be tong/xnbt_2.jpg)
Design output capacity: 60 m3/ h
![](/vnt_upload/File/Image/XN Be tong/xnbt_3.jpg)
The Grinder with 1500 liter capacity
![](/vnt_upload/File/Image/XN Be tong/xnbt_4.jpg)
![](/vnt_upload/File/Image/XN Be tong/xnbt_5.jpg)
03 concrete silo with 120 ton capacity
![](/vnt_upload/File/Image/XN Be tong/xnbt_6.jpg)
The material depot with 2000 m3 capacity
![](/vnt_upload/File/Image/XN Be tong/xnbt_7.jpg)
The material depot with 2000 m3 capacity
![](/vnt_upload/File/Image/XN Be tong/xnbt_8.jpg)
Transfer the materials to the grinder by skip
![](/vnt_upload/File/Image/XN Be tong/xnbt_9.jpg)
Transfer the materials to bunke
![](/vnt_upload/File/Image/XN Be tong/xnbt_10.jpg)
20-blending- tank truck (16 with average tank capacity 6m3, 4 with average tank capacity 8m3)
Real individual capacity:
![](/vnt_upload/File/Image/XN Be tong/xnbt_11.jpg)
Taihansacom cable project M 250 (300 – 350 m3/ca/8 hour) - finished
![](/vnt_upload/File/Image/XN Be tong/xnbt_12.jpg)
The six-storey- apartment project – Tam An M 250 (250 – 300 m3/ca/6 hour) - finished
![](/vnt_upload/File/Image/XN Be tong/xnbt_13.jpg)
Samil Vina work (350 – 400 m3/ca/9hour)
![](/vnt_upload/File/Image/XN Be tong/xnbt_14.jpg)
Suheung work (420-430 m3/ca/10h)